Final | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | PASS |
Dan Ediger
|
|
|
|
Final | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | NR |
Dan Ediger
|
|
|
Fainal is scheduled
|
Final | 10/11/2018 | 10/12/2018 | 10/12/2018 | A | FAIL |
Dan Ediger
|
|
|
Joe Phone #: ###-#### The electric water heater controls must be 18" above the garage floor
|
Plumbing Rough-in | 9/12/2018 | 9/12/2018 | 9/12/2018 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Adams
|
Plumbing Rough-in | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Adams all water lines in teh attic must be tented and covered with plasric. pipes need to be as low as possible
|
Groundwork | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Dan Ediger
|
|
|
|
Groundwork | 8/13/2018 | 8/14/2018 | 8/14/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Adams. The cleanout in the garage must be a wye branch fitting. Protect all piping in contact with the concrete.
|