Final | 10/5/2018 | 10/8/2018 | 10/8/2018 | A | PASS |
Dan Ediger
|
|
|
Please give our tech Anthony a call when en route. Thank you Phone #: ###-#### Inspection requested via web by Ben Davis
|
Plumbing Rough-in | 9/5/2018 | 9/6/2018 | 9/6/2018 | A | PASS |
Bill VanDegrift
|
|
|
Alteration: BATHROOM ADDITION INSTALL 2 TOILETS 2 SINKS 1 LAUNDRY TRAY 1 DRINKING FOUNTAIN 1BATHROOM SINK Phone #: ###-#### Inspection requested via web by Ben Davis ri ok
|
Plumbing Rough-in | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | CANC |
Bill VanDegrift
|
|
|
CALL WHEN ON WAY Phone #: ###-#### >> Inspection requested via web by Ben Davis Inspection cancelled from web by: Ben Davis
|
Groundwork | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | PASS |
Bill VanDegrift
|
|
|
Please give our technician Anthony a call when en route (number provided) Thank you! Phone #: ###-#### Inspection requested via web by Ben Davis gw ok
|