PLM-Aging Inspection | 5/25/2020 | 5/25/2020 | 5/26/2020 | | FAIL |
Matt Wrobel
|
|
|
no calls
|
PLM-Aging Inspection | 2/24/2020 | 2/24/2020 | 2/26/2020 | | PART |
Matt Wrobel
|
|
|
no calls
|
PLM-Aging Inspection | 11/25/2019 | 11/25/2019 | 11/25/2019 | | PART |
Matt Wrobel
|
|
|
no calls
|
Water and/or Sewer | 8/25/2019 | 8/26/2019 | 8/26/2019 | A | PASS |
Eric Strole
|
|
|
Need to have inspection of 5 250'' pex loops for radiant floor heat System was pressured saturday pm, pressure gage installed in temporary system, manifold will be installed after framing and upstairs radiant piping is installed. Pex is the aluminum cored version for oxygen barrier. There is one 1/2" pex line to kitchen island that has been run under insulation, no joints, IF there are any problems, please call owner / builder, i live 1/2 mile away, concrete crew, pump truck and concrete scheduled for tuesday 10:30 am, so if there are any issues please call me, Thanks Paul Phone #: ###-#### Inspection requested via web by J Goll-Test for under slab piping pass.
|
Water and/or Sewer | 7/2/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
Matt Wrobel
|
|
|
anytime after 10 am works for me venting corrections completed . Thank You Paul
Phone #: ###-#### Inspection requested via web by J Goll sewer and water plus groundwork ok to cover
|
PLM-Aging Inspection | 6/12/2019 | 6/12/2019 | 6/12/2019 | | PART |
Matt Wrobel
|
|
|
no calls
|