Final | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Paxman
|
Final | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PART |
Matt Wrobel
|
|
|
Just looking to get a partial for the first floor Inspection requested via web by Jeremy Paxman 1st floor complete
|
Plumbing Rough-in | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | PASS |
Daryl Spivey
|
|
|
Inspection requested via web by Jeremy Paxman
|
Plumbing Rough-in | 9/22/2018 | 9/24/2018 | 9/24/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Paxman Provide an accessable cleanout for each double santee or use fixture fittings. Provide a full size cleanout above the floor or within 5feet of the crawl access
|