Final | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | PASS |
Eric Strole
|
|
|
Dale-this is for the ADU Phone #: ###-####
|
Pressure Test | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | CANC |
Eric Strole
|
|
|
Dale Phone #: ###-####
|
Pressure Test | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | FAIL |
Eric Strole
|
|
|
Dale Phone #: ###-####-Need to open up other wall where tankless w/h is going to be and need nailplates for gas-tite.
|
Pressure Test | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | FAIL |
Eric Strole
|
|
|
Daryl Phone #: ###-####-Gas test fail, need to wrap gas pipe going thru wall & all gas piping covered up with out any inspections.
|
Plumbing Rough-in | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | PASS |
Eric Strole
|
|
|
call for access- Casey Phone #: ###-####
|
Other | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | DONE |
Eric Strole
|
|
|
conference- call 10 mins ahead- Casey Phone #: ###-####-Conferance on water.
|