Final | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Final | 12/26/2018 | 12/27/2018 | 12/27/2018 | A | PART |
Dan Ediger
|
|
|
call for code Phone #: ###-#### Inspection requested via web by Brian Johansen Install the master bathtub then call for final. all else ok
|
Plumbing Rough-in | 10/1/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|