Water Heater Final | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by McKenna Haycock
|
Water Heater Final | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | FAIL |
Dan Ediger
|
|
|
Must be after 2:00PM, if this is not possible we will reschedule. Thank you! Phone #: ###-#### Inspection requested via web by McKenna Haycock The condensate drain is kinked in two plances. Re-pipe, reschedule and send me a picture so I can pass the inspection
|
Water Heater Final | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | CANC |
Dan Ediger
|
|
|
Tankless water heater install Phone #: ###-#### >> Inspection requested via web by McKenna Haycock Inspection cancelled from web by: McKenna Haycock
|
Water Heater Final | 10/18/2018 | 10/19/2018 | 10/18/2018 | A | CANC |
Dan Ediger
|
|
|
Tankless water heater install Phone #: ###-#### >> Inspection requested via web by McKenna Haycock Inspection cancelled from web by: McKenna Haycock
|
Other | 10/11/2018 | 10/18/2018 | 10/18/2018 | A | CANC |
Dan Ediger
|
|
|
Test flu pipe for tankless water heater install. Final inspection will be scheduled at another time. Phone #: ###-#### Inspection requested via web by McKenna Haycock 5psi
|