Final | 2/22/2019 | 2/22/2019 | 2/22/2019 | P | PASS |
Matt Wrobel
|
|
|
door unlocked and contractor todd will be there Phone #: ###-#### Inspection requested via web by Robert Madrigal
|
Plumbing Rough-in | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Dan Ediger
|
|
|
Call Todd 2088617105 Phone #: ###-#### Inspection requested via web by Robert Madrigal
|
Plumbing Rough-in | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | FAIL |
Dan Ediger
|
|
|
Call Todd on when you are on your way 2088617105 Phone #: ###-#### Inspection requested via web by Robert Madrigal 1. check grade on all pipes and make corrections. 2. Put system under test. 3. Hang pipe per code
|
Plumbing Rough-in | 10/11/2018 | 10/12/2018 | 10/12/2018 | P | NH |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Madrigal
|