Water and/or Sewer | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Eric Strole
|
|
|
PVB HAS BEEN CERTIFIED NOW TO FINISH THE INSPECTION Phone #: ###-#### Inspection requested via web by Chris Field
|
Final | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field
|
Final | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PART |
Eric Strole
|
|
|
whole house water repipe. someone should be there. Contractor: Lloyd Cox ###-#### Phone #: ###-#### Inspection requested via web by Chris Field-Repipe pass. Pvb still needs tested.
|
Water and/or Sewer | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PART |
Eric Strole
|
|
|
FOR WATER MAIN REPLACEMENT ONLY Phone #: ###-#### Inspection requested via web by Chris Field water line o.k. to cover still need re-pipe and pvb needs tested
|