Final | 9/11/2019 | 9/12/2019 | 9/12/2019 | A | PASS |
Eric Strole
|
|
|
Final inspection on Shell and Core. Phone #: ###-#### Inspection requested via web by RM Mechanical
|
Card not on site to sign | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | PASS |
Eric Strole
|
|
|
Final inspection on Shell and Core. Phone #: ###-#### Inspection requested via web by RM Mechanical
|
Storm Drains | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | PART |
Dan Ediger
|
|
|
Inspect two remaining storm drains, south side of building. Renato site contact Phone #: ###-#### Inspection requested via web by RM Mechanical. Two south/east roof drains ok
|
Storm Drains | 8/23/2019 | 8/26/2019 | 8/26/2019 | A | PART |
Eric Strole
|
|
|
Two sets of storm drains and one gas line. Renato Albanese site contact. Phone #: ###-#### Inspection requested via web by RM Mechanical-Last 60 lb gas test pass. 2 north side primary roof drain test pass.
|
Pressure Test | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PART |
Eric Strole
|
|
|
7 of 8-60 lb gas test pass.
|
Plumbing Rough-in | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PART |
Eric Strole
|
|
|
Water supply for future tenants pass & vent for flr sink in mec room pass.
|
Water and/or Sewer | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PASS |
Matt Wrobel
|
|
|
Josh Wilson site contact. Phone #: ###-#### Inspection requested via web by RM Mechanical
|
DOC - Permit Finaled | 1/16/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Matt Wrobel
|
|
|
|
Groundwork | 10/30/2018 | 10/31/2018 | 10/31/2018 | P | PART |
Dan Ediger
|
|
|
Come in off of Fry Street Beverly Street is closed. Phone #: ###-#### Inspection requested via web by RM Mechanical trunk line and floor drain
|
Groundwork | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Dan Ediger
|
|
|
Fry St is the best way to come into the job Beverly St is closed Phone #: ###-#### Inspection requested via web by RM Mechanical
|