Final | 1/11/2019 | 1/11/2019 | 1/14/2019 | P | PASS |
Eric Strole
|
|
|
Breakroom sinks are rough-in only.
|
Final | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Paxman-Restrooms pass. Still need to install and hook-up both breakroom sinks.
|
Plumbing Rough-in | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | PASS |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 11/1/2018 | 11/1/2018 | 11/1/2018 | A | FAIL |
Dan Ediger
|
|
|
Contractor says prints are under green set of plans on the table 3rd floor. Thank you Phone #: ###-#### Inspection requested via web by Jeremy Paxman no test on DWV need access to Drainage system
|
Plumbing Rough-in | 10/31/2018 | 10/31/2018 | 10/31/2018 | A | FAIL |
Eric Strole
|
|
|
I will have a guy on site to open tiles on second floor where needed thank you Phone #: ###-#### Inspection requested via web by Jeremy Paxman-Need approved plans on site. All other corrections complete.
|
Plumbing Rough-in | 10/30/2018 | 10/30/2018 | 10/30/2018 | A | FAIL |
Eric Strole
|
|
|
3rd floor. Water is live test Phone #: ###-#### Inspection requested via web by Jeremy Paxman Need approved plans on site. DWV test fail. Need isolators on all waterlins in matal studs. A cleanout is required above urinal. Need access to plumbing below floor.
|