Final | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PASS |
Eric Strole
|
|
|
7352 Eric the main bath shower had to have some tile redone Phone #: ###-#### Inspection requested via web by robert goodson
|
Plumbing Rough-in | 12/7/2018 | 12/7/2018 | 12/7/2018 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by robert goodson
|
Groundwork | 10/29/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Eric Strole
|
|
|
Eric the test is on We have to find more pipe insulation So if you want to inspect in the morning that fine with me Phone #: ###-#### Inspection requested via web by robert goodson
|