Final | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | PASS |
Eric Strole
|
|
|
Eric, if you could please come around 10 I will everything ready for you. i appreciate it. Thanks. Phone #: ###-#### Inspection requested via web by Brian Watson
|
Plumbing Rough-in | 10/30/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Eric Strole
|
|
|
Eric was hoping to have you stop by at 1 p.m. if possible. running a new water service into building and its through a shared parking lot. would like to get it backfilled before end of day so no vehicle hazards. Phone #: ###-#### Inspection requested via web by Brian Watson
|
Water and/or Sewer | 10/30/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Eric Strole
|
|
|
Eric was hoping to have you stop by at 1 p.m. if possible. running a new water service into building and its through a shared parking lot. would like to get it backfilled before end of day so no vehicle hazards. Phone #: ###-#### Inspection requested via web by Brian Watson
|
Groundwork | 10/30/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Eric Strole
|
|
|
Eric was hoping to have you stop by at 1 p.m. if possible. running a new water service into building and its through a shared parking lot. would like to get it backfilled before end of day so no vehicle hazards. Phone #: ###-#### Inspection requested via web by Brian Watson
|