Final | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Eric Strole
|
|
|
tad Phone #: ###-####
|
Final | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | PART |
Eric Strole
|
|
|
Please call Tad prior to going to location so he can meet if he is not already there. ***###-####*** Sorry about Monday''s inspection we had lined up, there was miscommunication. -Angela Phone #: ###-#### Inspection requested via web by Luke Karel-Need open front seats on toilets.
|
Final | 1/25/2019 | 1/28/2019 | 1/28/2019 | A | NH |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Luke Karel-No access, left notice.
|
Plumbing Rough-in | 1/13/2019 | 1/14/2019 | 1/14/2019 | A | PASS |
Eric Strole
|
|
|
Bar Rough-in. Please contact Luke ###-#### or Tad Holmes - ###-#### with Dream Weaver Construction if you have questions Phone #: ###-#### Inspection requested via web by Luke Karel
|
Plumbing Rough-in | 1/1/2019 | 1/2/2019 | 1/2/2019 | A | PASS |
Eric Strole
|
|
|
2nd Phase partial rough-in inspection, Please contact Luke at ###-#### to discuss. The GC will be onsite. Phone #: ###-#### Inspection requested via web by Luke Karel
|
Groundwork | 11/20/2018 | 11/20/2018 | 11/20/2018 | P | PASS |
Matt Wrobel
|
|
|
Would like a plumbing ground work inspection for this afternoon please. If you have questions please contact Luke Karel ###-#### Phone #: ###-#### Inspection requested via web by Luke Karel
|
Plumbing Rough-in | 11/8/2018 | 11/9/2018 | 11/9/2018 | A | DONE |
Eric Strole
|
|
|
Pre-inspection with building contractor Tad Holmes ###-#### Plumber - Luke Karel ###-#### Phone #: ###-#### Inspection requested via web by Luke Karel-conferance.
|