PLM-Aging Inspection | 11/22/2019 | 11/22/2019 | 11/22/2019 | | PASS |
Matt Wrobel
|
|
|
|
DOC - Permit Finaled | 11/22/2019 | 11/22/2019 | 11/22/2019 | P | PASS |
Matt Wrobel
|
|
|
|
Sprinkler (Final) | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | CANC |
Matt Wrobel
|
|
|
New sprinkler system installed with backflow. Tested and approved need City approval Phone #: ###-#### >> Inspection requested via web by Trevor Smith Inspection cancelled from web by: Trevor Smith
|
PLM-Aging Inspection | 8/15/2019 | 8/15/2019 | 8/15/2019 | | PART |
Matt Wrobel
|
|
|
no calls
|
Sprinkler (Final) | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | PART |
Matt Wrobel
|
|
|
Needing to have a backflow inspection and full sprinkler inspection so that we can cover up the lines. Thank you so much Phone #: ###-#### Inspection requested via web by Trevor Smith backflow needs certified
|