Final | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | PASS |
Daryl Spivey
|
|
|
Please access from alleyway. Lock box code is 1313. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson
|
Pressure Test | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PASS |
Eric Strole
|
|
|
Corrections have been made. It is ready anytime. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson-20 lb gas test pass.
|
Pressure Test | 12/30/2018 | 12/31/2018 | 12/31/2018 | A | FAIL |
Eric Strole
|
|
|
Building should be open, gauge is on exterior of building near electrical service near alleyway. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson-Cannot strap csst in the wall in the vertival. Need to nailplate csst and wrap where go's thru exteriour wall and retest.
|
Plumbing Rough-in | 12/26/2018 | 12/27/2018 | 12/27/2018 | P | PASS |
Dan Ediger
|
|
|
Should be ready by noon. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson OK to cover. the water service needs the concrete removed around it to move freely
|