Final | 2/18/2019 | 2/19/2019 | 2/19/2019 | A | PASS |
Daryl Spivey
|
|
|
Daryl I will have this ready at 9 for you. Thanks. Phone #: ###-#### Inspection requested via web by Brian Watson
|
Final | 2/15/2019 | 2/15/2019 | 2/15/2019 | A | NH |
Dan Ediger
|
|
|
Daryl I will have this ready for you at 11. hope to see you out there. Phone #: ###-#### Inspection requested via web by Brian Watson door locked
|
Plumbing Rough-in | 1/7/2019 | 1/8/2019 | 1/8/2019 | P | PASS |
Matt Wrobel
|
|
|
I will have this ready around 2 if that works. Thank you. Phone #: ###-#### Inspection requested via web by Brian Watson
|
Groundwork | 1/7/2019 | 1/8/2019 | 1/8/2019 | P | PASS |
Matt Wrobel
|
|
|
I will have this ready around 2 if that works. Thank you. Phone #: ###-#### Inspection requested via web by Brian Watson
|