Sprinkler (Final) | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Chad Sargent
|
Other | 3/27/2019 | 3/27/2019 | 3/27/2019 | P | PASS |
Matt Wrobel
|
|
|
Ryan- inspection for back-flow Phone #: ###-#### PVB has been certified
|
Sprinkler (Final) | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Chad Sargent-PVB still not tested.
|
Sprinkler (Final) | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Chad Sargent-OK to cover, pvb needs tested.
|