Sprinkler (Final) | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PASS |
Eric Strole
|
|
|
Backflow inspection for new build. Sergio is contact Phone #: ###-#### Inspection requested via web by Nick Louie
|
Sprinkler (Final) | 2/1/2019 | 2/1/2019 | 2/1/2019 | A | FAIL |
Eric Strole
|
|
|
Backflow inspection for new build. Sergio is contact Phone #: ###-#### Inspection requested via web by Nick Louie-Hoseclamps need to be 180 degrees from each other & water line needs to grade from pvb back to main & drain.
|
Pressure Test | 1/30/2019 | 2/1/2019 | 2/1/2019 | A | CANC |
Eric Strole
|
|
|
Backflow inspection for new build. Sergio is contact Phone #: ###-#### Inspection requested via web by Nick Louie
|