Sprinkler (Final) | 3/1/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Eric Strole
|
|
|
re-inspection Phone #: ###-#### Inspection requested via web by Jay Craig
|
Groundwork | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | CANC |
Eric Strole
|
|
|
re-inspection Phone #: ###-#### Inspection requested via web by Jay Craig
|
Water and/or Sewer | 2/25/2019 | 2/26/2019 | 2/26/2019 | P | FAIL |
Eric Strole
|
|
|
for tie-in to city water service and backflow preventer Inspection requested via web by Jay Craig-Need 2 hose clamps on each connection & pvb needs tested.
|