Final | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Eric Strole
|
|
|
Please go as early as possible and call the customer when on way: Allen ; Judy ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks
|
Final | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | FAIL |
Chad Schwendiman
|
|
|
Please call on way: Joseph ###-#### or Allen ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - Need 6" clearance from single wall vent pipe to combustable material. ( pvc condensate piping), Need solid self closing gasketed door between water heater and bathroom
|