Final | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Daryl Spivey
|
|
|
|
Final | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | NR |
Daryl Spivey
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | PART |
Daryl Spivey
|
|
|
PADRICK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER mens restroom finished.....starting on womens.........ds
|
Plumbing Rough-in | 4/24/2019 | 4/25/2019 | 4/25/2019 | A | PART |
Daryl Spivey
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER test on south G/I passed...........ds
|
Plumbing Rough-in | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | PART |
Daryl Spivey
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 24 hr test on G/I tanks...........north tank ok south tank level dropped 10 inches or so...........ds
|
Groundwork | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | PASS |
Daryl Spivey
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER still need to do 24 hr test on G/I.......ds
|
Groundwork | 4/3/2019 | 4/3/2019 | 4/3/2019 | P | PART |
Daryl Spivey
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER partial on drain line and vents into tanks.......not tested at this time..........ds
|