Final | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Eric Strole
|
|
|
Please give me a call with any questions Phone #: ###-#### Inspection requested via web by Kelly King
|
Card not on site to sign | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | PASS |
Eric Strole
|
|
|
Please give me a call with any questions Phone #: ###-#### Inspection requested via web by Kelly King
|
Plumbing Rough-in | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly King
|
Plumbing Rough-in | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | FAIL |
Eric Strole
|
|
|
Please call Brian with any questions Phone #: ###-#### Inspection requested via web by Kelly King-Missing nailplates due to installing sheetrock before inspection.
|
Groundwork | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Dan Ediger
|
|
|
Please call James with any questions Phone #: ###-#### Inspection requested via web by Kelly King
|