Final | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Matt Wrobel
|
|
|
RE-INSPECT ON PARTIAL PASSED INSPECTION. BACKFLOW HAS NOW BEEN TESTED AND PASSED Phone #: ###-#### Inspection requested via web by Chris Field
|
Water and/or Sewer | 4/10/2019 | 4/12/2019 | 4/11/2019 | A | CANC |
Daryl Spivey
|
|
|
BACKFLOW WAS TESTED 4/11/19 Phone #: ###-#### >> Inspection requested via web by Chris Field Inspection cancelled from web by: Chris Field
|
Water and/or Sewer | 4/4/2019 | 4/9/2019 | 4/9/2019 | P | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field test pvb.........ds
|