Final | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PASS |
Eric Strole
|
|
|
|
Pressure Test | 8/14/2019 | 8/15/2019 | 8/15/2019 | P | CANC |
Eric Strole
|
|
|
Gas Piping Pressure Test Building B Phone #: ###-#### Inspection requested via web by RM Mechanical
|
Plumbing Rough-in | 8/14/2019 | 8/15/2019 | 8/15/2019 | P | CANC |
Eric Strole
|
|
|
For Building B Water and Vent Inspection Phone #: ###-#### Inspection requested via web by RM Mechanical
|
Roof Drains | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Matt Wrobel
|
|
|
2nd half of building
|
Other | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PART |
Matt Wrobel
|
|
|
Renato site contact. Partial gas line inspection. Phone #: ###-#### Inspection requested via web by RM Mechanical 8 gas tests 60# pass
|
Roof Drains | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PART |
Matt Wrobel
|
|
|
Renato site contact. Partial roof drain inspection. Phone #: ###-#### Inspection requested via web by RM Mechanical south half bldg ok
|
Plumbing Rough-in | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | FAIL |
Dan Ediger
|
|
|
Renato Albanese site contact. Phone #: ###-#### Inspection requested via web by RM Mechanical. Three (3) gas pressure tests failed.
Water and fd vent ok.
|
Storm Drains | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PART |
Matt Wrobel
|
|
|
Building B for storm drain rough in underground. Renato site contact. Phone #: ###-#### Inspection requested via web by RM Mechanical storm drains ok
|
Plumbing Rough-in | 4/26/2019 | 4/29/2019 | 4/29/2019 | A | PART |
Matt Wrobel
|
|
|
Underground rough in. Renato Albanese site contact Phone #: ###-#### Inspection requested via web by RM Mechanical underground raindrains ok to bury
|