Water and/or Sewer | 7/1/2019 | 7/2/2019 | 7/2/2019 | P | CANC |
Matt Wrobel
|
|
|
anytime after 11 am works for me, previously approved from street to foundation, Now need inspection for the sewer line that will be under the slab on grade floor. Sewer line is filled with water and plugged at cleanout . not sure if its this permit or the other plumbing permit for this final segment of the sewer line. thanks Paul Phone #: ###-#### Inspection requested via web by J Goll wrong peremit this one is complete
|
DOC - Permit Finaled | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Matt Wrobel
|
|
|
|
Water and/or Sewer | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | PASS |
Matt Wrobel
|
|
|
Would like to get sewer line and water line inspected from road to house anytime after 3 pm friday so I can fill in the pit as soon as possible. Water line will be inside 4" corrugated drain pipe to ease backfill requirements and layed in same trench as sewer pipe which is sch, 40 pvc. New Water meter service is being installed next week adjacent to the pit for this sewer connection. Thank You Paul
Phone #: ###-#### Inspection requested via web by J Goll
|