Final | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field
|
Card not on site to sign | 8/2/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
Matt Wrobel
|
|
|
|
Final | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | PART |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field need tempering valves on lavs
|
Plumbing Rough-in | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field
|
Plumbing Rough-in | 6/7/2019 | 6/10/2019 | 6/10/2019 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field 1. Repair the leak in the 2" vent in the overhead. 2. Remove the non-shielded band in the 2" vent over the Men's rr. 3. Lable the water shut-off valves.
|
Groundwork | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | NR |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field no building permit yey under review
|
Groundwork | 5/6/2019 | 5/8/2019 | 5/8/2019 | P | CANC |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field not ready
|