Final | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PASS |
Matt Wrobel
|
|
|
Backflow inspection and union installation completed. Phone #: ###-#### Inspection requested via web by Timber VanLom
|
Final | 6/14/2019 | 6/17/2019 | 6/17/2019 | P | PART |
Matt Wrobel
|
|
|
Timbler Phone #: ###-#### Please call for access. ok to cover need add a union above ground within 12 inches and backflow needs certified
|