Final | 11/1/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Matt Wrobel
|
|
|
LATE PM - If questions call Efrain @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 8/8/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Matt Wrobel
|
|
|
waste ; water. If questions call Efrain @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Med/Gas Systems | 7/3/2019 | 7/8/2019 | 7/9/2019 | P | PASS |
Dan Ediger
|
|
|
LATE PM - Underground med air ; vacuum - If questions call Efrain @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann Based on NFPA 99 Type 3 system. The pipe has been sleeved and pressure tested.
|
Groundwork | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Matt Wrobel
|
|
|
CALL 30 mins PRIOR - Efrain ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Groundwork | 6/26/2019 | 6/27/2019 | 6/26/2019 | A | CANC |
Matt Wrobel
|
|
|
if questions call Efrain @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
|