Final | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
Matt Wrobel
|
|
|
RON-stop 5 ft from building Phone #: ###-####
|
Water and/or Sewer | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PART |
Dan Ediger
|
|
|
Need an inspection request to view exposed water service connection outside of the building prior to final. Temp occ ok
|
Water and/or Sewer | 7/18/2019 | 7/19/2019 | 7/19/2019 | A | PART |
Matt Wrobel
|
|
|
project 95% done. Would like insp. to be able to backfill trench. Phone #: ###-#### Inspection requested via web by ronald gulley ok to bury mainline need to leave building end open to see connection when made
|