Final | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Josh Kelley
|
Plumbing Rough-in | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | PASS |
Daryl Spivey
|
|
|
Just need rough passed from partial Phone #: ###-#### Inspection requested via web by Josh Kelley fire sprinkler system permitted seperately by other contr...........ds
|
Plumbing Rough-in | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | PART |
Daryl Spivey
|
|
|
They''re worried about HVAC getting to the crawl before inspection Phone #: ###-#### Inspection requested via web by Josh Kelley water, waste and vent ok...........fire sprklr system not approved..........needs licensed installer and engineered cert. plan........ds
|
Groundwork | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Daryl Spivey
|
|
|
Guys will be done about 9:30 Phone #: ###-#### Inspection requested via web by Josh Kelley
|