Sprinkler (Final) | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Eric Strole
|
|
|
Cindy ###-#### Inspection requested via web by Michael McDonald
|
Sprinkler (Final) | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | FAIL |
Eric Strole
|
|
|
Cindy ###-#### Inspection requested via web by Michael McDonald-Ok to cover main & drain. Pvb is required to be 12 inches above all downstream piping and flood rim of receptor.
|
Sprinkler (Final) | 7/24/2019 | 7/25/2019 | 7/25/2019 | P | FAIL |
Eric Strole
|
|
|
Inspection requested via web by Michael McDonald-Cannot find backflow. No contact number.
|