Final | 11/11/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|
Pressure Test | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | CANC |
Matt Wrobel
|
|
|
reconfigure gas line tee in at new meter out back door. Phone #: ###-#### Inspection requested via web by Nels Moore 25# test pass
|
Pressure Test | 8/21/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Matt Wrobel
|
|
|
added gas line for new water heater and dryer 2#. Back left corner of building, inside. Phone #: ###-#### Inspection requested via web by Nels Moore 60# test ok
|
Plumbing Rough-in | 8/21/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|
Groundwork | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PASS |
Matt Wrobel
|
|
|
lock box on front door, call Nels for code. thanks Phone #: ###-#### Inspection requested via web by Nels Moore
|