Final | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Eric Strole
|
|
|
Gate will be unlocked. Crawlspace opening is in back yard. Back flow is certified and is attached to the front sprinkler bib. Phone #: ###-#### Inspection requested via web by Michael Webb
|
Water and/or Sewer | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Eric Strole
|
|
|
Water service inspection. Thank you. Phone #: ###-#### Inspection requested via web by Michael Webb-Waterline pass, ok to cover.
|
Groundwork | 8/6/2019 | 8/7/2019 | 8/6/2019 | A | CANC |
Eric Strole
|
|
|
Water service inspection. Thank you. Phone #: ###-#### Inspection requested via web by Michael Webb
|