Final | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Matt Wrobel
|
|
|
Don *screened* Phone #: ###-#### (video call ok)
|
Water and/or Sewer | 3/1/2020 | 3/2/2020 | 3/2/2020 | A | PART |
Matt Wrobel
|
|
|
requesting rough in inspection Phone #: ###-#### Inspection requested via web by Don Taylor rough in pass
|
Other | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | DONE |
Matt Wrobel
|
|
|
Don- conference Phone #: ###-####
|
Plumbing Rough-in | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PART |
Matt Wrobel
|
|
|
Call half hour before // Don Phone #: ###-#### lav and wc rough ok
|
Other | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | DONE |
Matt Wrobel
|
|
|
Don-Conference-call to meet Phone #: ###-####
|
Other | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | DONE |
Matt Wrobel
|
|
|
conference // Don Phone #: ###-####
|