Final | 4/15/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Eric Strole
|
|
|
Please call when 15 mins away Phone #: ###-#### Inspection requested via web by Pat Falls
|
Pressure Test | 4/8/2020 | 4/9/2020 | 4/9/2020 | A | PASS |
Eric Strole
|
|
|
Please come by first stop Phone #: ###-#### Inspection requested via web by Pat Falls-Test on snow melt pass.
|
Pressure Test | 11/5/2019 | 11/5/2019 | 11/5/2019 | P | PASS |
Eric Strole
|
|
|
Flue pressure test, ready late afternoon Phone #: ###-#### Inspection requested via web by Pat Falls-Flue test pass.
|
Pressure Test | 9/2/2019 | 9/3/2019 | 9/3/2019 | A | PASS |
Eric Strole
|
|
|
3 radiant manifolds, 1 in lower floor mechanical rm. Phone #: ###-#### Inspection requested via web by Pat Falls
|
Pressure Test | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PART |
Eric Strole
|
|
|
Supply/return piping test Phone #: ###-#### Inspection requested via web by Pat Falls-Section tested pass.
|
Pressure Test | 8/19/2019 | 8/19/2019 | 8/19/2019 | A | NR |
Eric Strole
|
|
|
Supply/return piping test Phone #: ###-#### Inspection requested via web by Pat Falls
|
Water and/or Sewer | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | CANC |
Eric Strole
|
|
|
Supply/return piping test Phone #: ###-#### Inspection requested via web by Pat Falls
|