Water and/or Sewer | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Dan Ediger
|
|
|
complete 24 hour test on the grease intercepter completed tie-ins. witnessed h20 joint and will be leak check when meter is unlocked
|
DOC - Permit Finaled | 10/3/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
Dan Ediger
|
|
|
final water connection is exposed and will be leak check after meter is unlocked
|
Other | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PART |
Dan Ediger
|
|
|
Coit Phone #: ###-#### start 24hr test at 10:00 am
|
Water and/or Sewer | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | PART |
Dan Ediger
|
|
|
water line -Coit Phone #: ###-#### water line partial. ok to cover. Main ditch paralell with the existing building
|
Groundwork | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | FAIL |
Eric Strole
|
|
|
Coit Phone #: ###-####-Need to use approved fittings & waterline needs to be 42" deep.
|