Final | 9/13/2019 | 9/19/2019 | 9/19/2019 | A | PASS |
Daryl Spivey
|
|
|
Bill is onsite contact. Phone #: ###-#### Inspection requested via web by Lynn Mallory
|
Final | 9/13/2019 | 9/16/2019 | 9/13/2019 | A | CANC |
Daryl Spivey
|
|
|
Onsite Contact: Bill Phone #: ###-#### >> Inspection requested via web by Lynn Mallory Inspection cancelled from web by: Lynn Mallory
|
Final | 9/6/2019 | 9/9/2019 | 9/9/2019 | A | NR |
Dan Ediger
|
|
|
Re-inspection on part of mainline. Phone #: ###-#### Inspection requested via web by Lynn Mallory. Met with the tech and went over options. One of the sewer runs that runs from the back carrage house appears to have no sewer tie-in at the street.
|
Final | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PART |
Eric Strole
|
|
|
We would like a final inspection on the first half of mainline replacement so we can backfill before starting second half. Onsite Contact: Bill (Roto-Rooter) his phone number is listed above. Phone #: ###-#### Inspection requested via web by Lynn Mallory-Need to fix backgraded section by pool house & bow at 2nd c/o.
|