Final | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | PASS |
Daryl Spivey
|
|
|
First thing if possible please. Phone #: ###-#### Inspection requested via web by Julie Danible
|
Final | 12/27/2019 | 12/30/2019 | 12/30/2019 | P | CANC |
Daryl Spivey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Julie Danible Inspection cancelled from web by: Julie Danible
|
Final | 12/24/2019 | 12/26/2019 | 12/26/2019 | P | PART |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Julie Danible 1. Install tempering valves on the Family RR lavs. 2. Pull a new permit for kithcen fixture install or add to the existing.
|
Plumbing Rough-in | 11/21/2019 | 11/21/2019 | 11/21/2019 | A | PASS |
Daryl Spivey
|
|
|
RI water waste for new men''s bathroom Phone #: ###-#### Inspection requested via web by Julie Danible 2nd floor hallway bathroom............ds
|
Plumbing Rough-in | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PART |
Daryl Spivey
|
|
|
Floor sinks behind the bar. Please let us know if you would like us to meet you there. Phone #: ###-#### Inspection requested via web by Julie Danible new bar area ok for cover............ds
|
Plumbing Rough-in | 10/9/2019 | 10/10/2019 | 10/10/2019 | A | PASS |
Daryl Spivey
|
|
|
Women''s restroom Phone #: ###-#### Inspection requested via web by PATTY KIRK 2nd floor in Bar area south side...........test ok.......ds
|
Plumbing Rough-in | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | CANC |
Daryl Spivey
|
|
|
Phone #: ###-#### >> Inspection requested via web by PATTY KIRK Inspection cancelled from web by: PATTY KIRK
|