Final | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | PASS |
Eric Strole
|
|
|
BRECK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 11/25/2019 | 11/26/2019 | 11/26/2019 | A | PART |
Eric Strole
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need to add a RPBA on espresso machine and have tested along with RPBA for ice maker.
|
Final | 10/23/2019 | 10/24/2019 | 10/24/2019 | P | PART |
Dan Ediger
|
|
|
BRECK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER Temp occ ok. 1. Install backfow to coffee machines and possibly the water filter in the breakroom. 2. Lower the drain at the breakroom sink to make a legal connection on the continuous waste.
|
Plumbing Rough-in | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PART |
Dan Ediger
|
|
|
BRECK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. office area ok to cover
|
Plumbing Rough-in | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | NR |
Daryl Spivey
|
|
|
BRECK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|