Final | 4/2/2020 | 4/2/2020 | 4/2/2020 | P | PASS |
Matt Wrobel
|
|
|
CALL AHEAD to Ryan @ ###-####. (Norco reports emailed to Dan Ediger) Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Med/Gas Systems | 12/12/2019 | 12/13/2019 | 12/13/2019 | P | PART |
Matt Wrobel
|
|
|
24 hour check pass ok to cover
|
Med/Gas Systems | 12/12/2019 | 12/12/2019 | 12/12/2019 | P | PART |
Matt Wrobel
|
|
|
med gas pressure test witness. Call Ryan @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann start 24 hour test
|
Plumbing Rough-in | 11/11/2019 | 11/12/2019 | 11/12/2019 | A | PART |
Dan Ediger
|
|
|
rough-in ; Med Gas Pressure Test Witness. If questions call Ryan @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann ok to cover water and med gas in walls. Med gas test holding; 24 hr test on final install
|