Sprinkler (Final) | 10/15/2019 | 10/16/2019 | 10/16/2019 | A | PART |
Matt Wrobel
|
|
|
backflow preventer to be inspected with new water sevice tie-in, please inform if inspection cannot be performed before 1pm. Phone #: ###-#### Inspection requested via web by JEFFERY STENSLAND ok to cover backflow needs certified
|
Other | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | DONE |
Matt Wrobel
|
|
|
Jeff Phone #: ###-####
|