Plumbing Rough-in | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | PASS |
Eric Strole
|
|
|
Re inspection of rough in with addition of vault and riser piece to meet pump manufacturers requirements as well as code. Phone #: ###-#### Inspection requested via web by Tim Beck
|
Water and/or Sewer | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | PASS |
Eric Strole
|
|
|
Re inspection of rough in with addition of vault and riser piece to meet pump manufacturers requirements as well as code. Phone #: ###-#### Inspection requested via web by Tim Beck-Ejector pass.
|
Plumbing Rough-in | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | FAIL |
Eric Strole
|
|
|
Tim ###-####-Ejector is not approved for the outside depth.
|
Plumbing Rough-in | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | FAIL |
Eric Strole
|
|
|
Tim ###-####-Need brand and model # of ejector canister installed outside. Waterline needs to be 42" deep. Need to test all dwv.
|
Water and/or Sewer | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 12/16/2019 | 12/17/2019 | 12/17/2019 | A | PART |
Dan Ediger
|
|
|
Tim Phone #: ###-#### rescheduled to pm today
|