Final | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | PASS |
Daryl Spivey
|
|
|
Other contractors should be onsite. Please call me with any problems. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson
|
Pressure Test | 12/28/2019 | 12/30/2019 | 12/30/2019 | A | PASS |
Daryl Spivey
|
|
|
Other contractors should be onsite. Gauge for gas line is at fireplace in master bathroom. Other termination is in basement. Phone #: ###-#### Inspection requested via web by Josh Johnson 20 lb test ok..........ds
|
Plumbing Rough-in | 11/25/2019 | 11/26/2019 | 11/26/2019 | A | PASS |
Daryl Spivey
|
|
|
Other contractors should be onsite for access. Phone #: ###-#### Inspection requested via web by Josh Johnson
|
Groundwork | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Daryl Spivey
|
|
|
Groundwork is accessible from side of house, house using occupied. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson
|