Final | 1/28/2020 | 1/30/2020 | 1/30/2020 | A | PASS |
Daryl Spivey
|
|
|
Job is ready for final. Call for lock box code if no one is on site. Thanks. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Daryl Spivey
|
|
|
Ready for reinspection, corrected. Hasib is contact. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | PART |
Daryl Spivey
|
|
|
Upstairs bathrooms, kitchen sink. Hasib journeyman on job Phone #: ###-#### Inspection requested via web by Scott Sparrell water ok...........waste failed. reverse grade on upstairs master lav drain............ds
|