Water and/or Sewer | 3/2/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Eric Strole
|
|
|
12;30 PM Phone #: ###-#### Inspection requested via web by keith braun
|
Water and/or Sewer | 3/2/2020 | 3/2/2020 | 3/2/2020 | P | PART |
Eric Strole
|
|
|
Should be ready by 12 Phone #: ###-#### Inspection requested via web by keith braun-Start of 24 hr test on lift tank.
|
Water and/or Sewer | 2/27/2020 | 2/27/2020 | 2/27/2020 | P | PART |
Eric Strole
|
|
|
Be ready by 12 Phone #: ###-#### Inspection requested via web by keith braun-This is on a lift station. Ok to cover discharge line. Need to test tank.
|