Water Heater Final | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Jack Reynolds
|
|
|
Christian - 1-###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - water heater final ok
|
Water Heater Final | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | FAIL |
Jack Reynolds
|
|
|
- t&p needs ran in new materials to 6-24" above floor and should not have weep hole in material
|
Water and/or Sewer | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | CANC |
Eric Strole
|
|
|
|
Final | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | CANC |
Eric Strole
|
|
|
Christian ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks (This activity was added in error so we have changed the case status back to Issued.)
|