Sprinkler (Final) | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Eric Strole
|
|
|
|
Other | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PART |
Eric Strole
|
|
|
The superintendent of the project asked me to have a preliminary inspection on the plumbing that is in place. We will be setting the backflow and calling for certification for that in the next couple days. Phone #: ###-#### Inspection requested via web by Mike Martin-Main,drain & riser, pass, still need backflow.
|