Final | 3/24/2020 | 3/24/2020 | 3/24/2020 | P | PASS |
Matt Wrobel
|
|
|
We have our new tub and sink all installed Phone #: ###-#### Inspection requested via web by Peri-Ann McLaren
|
Plumbing Rough-in | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Matt Wrobel
|
|
|
We have the bathtub installed with new drain and installed a higher shower pipe. We hope to also have vanity installed by friday evening as well but that is to be determined. My boyfriend Christopher Hutchinson will be there for the inspector. Phone #: ###-#### Inspection requested via web by Peri-Ann McLaren
|