Plumbing Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | PART |
Dan Ediger
|
|
|
Hot water return in garage. Phone #: ###-#### Inspection requested via web by Preston Langdon 4TH FLOOR hot water return lines ok PT passed
|
Plumbing Rough-in | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | PART |
Matt Wrobel
|
|
|
Rough DWV and Water: Units 301-309, 401-409 Please arrive before 330pm. Phone #: ###-#### Inspection requested via web by Preston Langdon 301-309 401-409-garage units plus 1st floor bathroom janitors closet pass marked on prints m.w.
|
Plumbing Rough-in | 6/16/2020 | 6/17/2020 | 6/17/2020 | A | PART |
Daryl Spivey
|
|
|
Garage sanitary stacks and overhead, Area B Phone #: ###-#### Inspection requested via web by Preston Langdon 3 sanitary stacks and venting from 1st floor bathroom tested thru 4th floor parking garage ceiling east end..........ds
|
Plumbing Rough-in | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PART |
Daryl Spivey
|
|
|
Garage drains, Area B Phone #: ###-#### Inspection requested via web by Preston Langdon marked on plans...discussed drainage on planter boxes.....ds
|